Todo
Condensed from TODO.md at build time: 3 open item(s), 8 completed.
- Optionally add an equatorial alignment mark on the two halves so the assembled relief seam is obviously continuous before the first twist.
- Should the standard build keep flat oceans, or map seafloor relief (like the `model-render-print` non-flat run)? Flat is the default today (decided 2026-08-27, see `documents/05-globe-box-approach.md`).
- Stand or base for the assembled globe? Not requested; the box is currently a free-standing sphere when the halves are locked.